Archived posting to the Leica Users Group, 2003/09/10
[Author Prev] [Author Next] [Thread Prev] [Thread Next] [Author Index] [Topic Index] [Home] [Search]On 9/10/03 richard@imagecraft.com (Richard F. Man) thoughtfully wrote: > >So if I understand correctly, the whole process should be relatively simple >if I throw money at it, and buy something like a Jobo CPE-2 kit? All I >would need is water supply, the Jobo will take care of the water >temperature, and a dark place to load the film. Once loaded with the film >and chemical, the Jobo does "everything." Is it right? > I think you need the industrial strength Jobo to do that, like the one Brian has. With the smaller ones like the CPE-2 you have to manually operate the lift to dump chemistry and pour in new chemistry. Adam - -- To unsubscribe, see http://mejac.palo-alto.ca.us/leica-users/unsub.html